Ballal, T M A and Sher, W D (2003) Artificial neural networks for the selection of buildable structural systems. Engineering, Construction and Architectural Management, 10(04), 263–71.
Gorse, C A and Emmitt, S (2003) Investigating interpersonal communication during construction progress meetings: challenges and opportunities. Engineering, Construction and Architectural Management, 10(04), 234–44.
Kanoglu, A (2003) An integrated system for duration estimation in design/build projects and organizations. Engineering, Construction and Architectural Management, 10(04), 272–82.
Mills, A, Harris, D and Skitmore, M R (2003) The accuracy of housing forecasting in Australia. Engineering, Construction and Architectural Management, 10(04), 245–53.
Price, A D F (2003) The strategy process within large construction organizations. Engineering, Construction and Architectural Management, 10(04), 283–96.
- Type: Journal Article
- Keywords: case studies; buildings; physical planning; construction industry; strategic planning
- ISBN/ISSN: 0969-9988
- URL: http://titania.emeraldinsight.com/vl=1289930/cl=13/nw=1/rpsv/cw/mcb/09699988/v10n4/s6/p283
- Abstract:
This paper investigates current approaches to the process of managing strategy within the construction industry. The results from nine case studies have been summarised under the headings of: defining the process of developing strategy; activities and outputs associated with the strategic process; strategic tools and techniques used in the process; outputs to the strategic process and factors that govern strategic success time scale for planning horizons; the level of personnel involvement; and the most important factors for successful implementation of strategy. The strategic frameworks adopted by the case study organisations have been combined into a single framework for managing the strategic process. Several issues of strategic concern were identified and recommendations have been put forward under three headings: development of the strategic process; improvement of internal and external audits; and increased application of appropriate tools and techniques.
Wood, G D and Ellis, R C T (2003) Risk management practices of leading UK cost consultants. Engineering, Construction and Architectural Management, 10(04), 254–62.